MRP is defined at the plant level. (Mã câu: 4089, Số lựa chọn đúng = 1). True. False.

The MRP list, unlike the stock/requirements list, highlights changes to MRP elements that have occurred since MRP was executed. (Mã câu: 4125, Số lựa chọn đúng = 1). True. False.

When a company transfers part of the materials in stock from one distribution center to another, this scenario is known as stock-out. (Mã câu: 4082, Số lựa chọn đúng = 1). True. False.

Period lot-sizing procedures combine the requirements from multiple time periods, such as days or weeks, into one lot. (Mã câu: 4101, Số lựa chọn đúng = 1). True. False.

The main objective of material planning is (Mã câu: 4046, Số lựa chọn đúng = 1). A. To minimize the expenses for storing excess inventory. B. To balance the demand for materials with the supply. C. To shorten the duration of the procurement cycle. D. To eliminate excess inventory. E. To prevent lost sales.

MRP uses requirements to generate the final procurement proposals (Mã câu: 4085, Số lựa chọn đúng = 1). A. True. B. False.

In make-to-stock strategy the production of the finished goods and any needed semifinished goods is triggered by a sales order. (Mã câu: 4110, Số lựa chọn đúng = 1). A. True. B. False.

The manner in which CIRs consume PIRs is determined by the (Mã câu: 4068, Số lựa chọn đúng = 1). A. Consumption type. B. Consumption mode. C. Consumption strategy. D. Planning strategy. E. Planning type.

Consider the following scenario, then choose which one of the options below corresponds to the level of CIRs and PIRs after consumption.Before consumption: Procurement proposal for CIRs: 50Procurement proposal for PIRs: 50 (Mã câu: 4067, Số lựa chọn đúng = 1). A. CIRs: 50, PIRs: 0. B. CIRs: 50, PIRs: 50. C. CIRs: 0, PIRs: 0. D. CIRs: 0, PIRs: 50. E. CIRs: 100, PIRs: 100.

Product routings is one of the master data elements in material planning. (Mã câu: 4087, Số lựa chọn đúng = 1). A. True. B. False.

Master production scheduling is specialized form of(Mã câu: 4074, Số lựa chọn đúng = 1). A. MRP. B. Demand planning. C. SOP. D. Production planning. E. Operations scheduling.

Material planning is concerned with answering which basic questions? (Mã câu: 4013, Số lựa chọn đúng = 3). A. Which planning version should the company choose?. B. What materials are required?. C. What is the shortest time required for completing the planning?. D. When are the materials required?. E. How many materials are required?.

In the determine procurement proposal step, for materials with the procurement type of internal, MRP will: (Mã câu: 4077, Số lựa chọn đúng = 1). A. Generate purchase requisitions. B. Provide three options. C. Prompt the MRP controller to select the appropriate production version. D. Transfer this step to MPS. E. Always generate planned orders.

A processing key is a control parameter that determines how the materials in the MRP list will be organized. (Mã câu: 4123, Số lựa chọn đúng = 1). A. True. B. False.

MPS creates planned orders for the MPS items and dependent requirements for all items in the BOM. (Mã câu: 4119, Số lựa chọn đúng = 1). A. True. B. False.

After planning the master schedule items, MRP creates dependent requirements for the components of those items.(Mã câu: 4117, Số lựa chọn đúng = 1). A. True. B. False.

Planned orders are requests to produce materials. (Mã câu: 4084, Số lựa chọn đúng = 1). A. True. B. False.

The lot size calculation step in MRP is used to determine whether there is a need to procure the material. (Mã câu: 4121, Số lựa chọn đúng = 1). A. True. B. False.

Typically, semifinished goods and raw materials have dependent requirements. (Mã câu: 4098, Số lựa chọn đúng = 1). A. True. B. False.

The master data elements in material planning are: (Mã câu: 4051, Số lựa chọn đúng = 1). A. Material masters, product types, storage location, vendors. B. Product routings, bills of material, material masters, product groups. C. Product types, product routings, material masters, product groups. D. Product routings, product types, material masters, customers. E. Material masters, storage location, product groups, product routings.

Which of the following are master data relevant to material planning? (Mã câu: 4018, Số lựa chọn đúng = 2). A. Storage location. B. Bills of material. C. Material master. D. Planning version. E. Production version.

Which of the following are production control techniques as indicated by the MRP type in the material master? (Mã câu: 4022, Số lựa chọn đúng = 2). A. Consumption-based planning. B. External control. C. Internal control. D. Sales order-based planning. E. No planning.

Requirements that are calculated based on actual and forecasted sales are known as (Mã câu: 4061, Số lựa chọn đúng = 1). A. Planned independent requirements. B. Customer-planned independent requirements. C. Integrated independent requirements. D. Forecast-independent requirements. E. Customer-independent requirements.

The planning result report aggregates quantities for MRP elements to make it easier to view the overall picture. (Mã câu: 4126, Số lựa chọn đúng = 1). A. True. B. False.

Which of the following statements best represents what procurement type indicates? (Mã câu: 4053, Số lựa chọn đúng = 1). A. How a material is produced. B. Vendor’s groups. C. All of the ways to procure a material the user will choose from when making a decision. D. Whether a material is produced in house, obtained externally, both, or none. E. How a vendor will be chosen in the procurement process.

What does SOP stand for? (Mã câu: 4069, Số lựa chọn đúng = 1). A. Sales and operations planning. B. Strategic operations planning. C. Sales operations planner. D. Systems operations products. E. Sales operations projects.

Which of the following options represents categories of consumption-based planning? (Mã câu: 4057, Số lựa chọn đúng = 1). A. Materials-requirement planning, time-phased planning, reorder-point planning. B. Master production scheduling, MRP, forecast-based planning. C. MRP, forecast-based planning, master production scheduling. D. Forecast-based planning, time-phased planning, reorder-point planning. E. None of the above.

Setup time, processing time, and interoperation time are elements of (Mã câu: 4064, Số lựa chọn đúng = 1). A. In-house production time. B. Goods issue processing time. C. Planned delivery time. D. Goods receipt processing time. E. Planned shipping time.

Consumption-based planning calculates the requirements for a material based on current consumption data. (Mã câu: 4094, Số lựa chọn đúng = 1). A. True. B. False.

The ERP system initially uses forward scheduling and employs backward scheduling only if forward scheduling is unsuccessful. (Mã câu: 4122, Số lựa chọn đúng = 1). A. True. B. False.

In time-phased planning, materials are ordered when the stock level reaches a predetermined level known as the reorder point. (Mã câu: 4095, Số lựa chọn đúng = 1). A. True. B. False.

Semifinished goods are typically purchased from vendors (Mã câu: 4092, Số lựa chọn đúng = 1). A. True. B. False.

MRP type specifies (Mã câu: 4054, Số lựa chọn đúng = 1). A. Whether the material is produced in house or is obtained externally. B. How material quantities for planning will be calculated. C. The production control technique used in planning. D. The available time periods the ERP system can use for scheduling. E. The strategy for BOM selection.

The most important reporting tool in material planning is the (Mã câu: 4079, Số lựa chọn đúng = 1). A. Planning result report. B. MRP list. C. Stock overview. D. Stock/requirements list. E. Strategies list.

The BOM selection method in the material master identifies the criteria the system should use to select the BOM. (Mã câu: 4104, Số lựa chọn đúng = 1). A. True. B. False.

Which of the following statements regarding a BOM are TRUE? (Mã câu: 4030, Số lựa chọn đúng = 3). A. A BOM identifies the components needed to make the material. B. A BOM identifies the sequence of operations needed to make the materials. C. A BOM component can have its own BOM. D. A BOM identifies the material’s routing strategy.E. A BOM is plant specific. E. A BOM is plant specific.

Which of the following statements concerning the outcome of the material planning process are NOT TRUE? (Mã câu: 4020, Số lựa chọn đúng = 3). A. The outcome can be multiple procurement proposals. B. The outcome is always a single procurement proposal. C. The outcome triggers the sales and operations planning step. D. The outcome triggers the forecasting planning step. E. The outcome can trigger either the production or the procurement process.

The purpose of the materials requirements planning step is to (Mã câu: 4036, Số lựa chọn đúng = 2). A. Calculate PIR. B. Calculate CIR. C. Calculate net requirements. D. Generate procurement proposals (requisitions and planned orders). E. Calculate reorder points.

For externally procured materials, the planned delivery time and the GR processing time are used to determine procurement time. (Mã câu: 4102, Số lựa chọn đúng = 1). A. True. B. False.

The stock/requirements list displays (Mã câu: 4080, Số lựa chọn đúng = 1). A. Changes in the planning situation since MRP was run. B. MRP elements at an aggregation level. C. All MRP elements for a material. D. Required materials per production version. E. All materials needed per MRP element.

A company would be most likely to apply consumption-based planning for which of the following products? (Mã câu: 4058, Số lựa chọn đúng = 1). A. Car. B. Brake. C. Engine. D. Printer. E. Pen.

Which of the following statements about consumption-based planning are NOT TRUE? (Mã câu: 4024, Số lựa chọn đúng = 2). A. It includes forecast-based planning as one of its categories. B. It calculates the requirements for a material based on historical consumption data. C. It is relatively more complicated compared with MRP. D. It assumes that future consumption will follow the same patterns as past consumption. E. It takes into account dependencies between different materials.

Which of the following are common time estimates utilized during the planning process? (Mã câu: 4026, Số lựa chọn đúng = 3). A. Production planning time. B. GR processing time. C. Planned delivery time. D. Planned receiving time. E. In-house production time.

The lot size key specifies the (Mã câu: 4062, Số lựa chọn đúng = 1). A. Optimum lot size for a group of materials. B. Recommended lot size for a material. C. Procedure used to determine the capacity of a storage area. D. Lot size groups per each material type. E. Procedure that is used to determine the lot size.

MRP data are specific to each plant. (Mã câu: 4090, Số lựa chọn đúng = 1). A. True. B. False.

Material planning is one of the most complex processes within an organization. (Mã câu: 4083, Số lựa chọn đúng = 1). A. True. B. False.

Which of the following statements regarding MRP are TRUE? (Mã câu: 4038, Số lựa chọn đúng = 2). A. Planning is executed for only the first level of the material’s BOM. B. MRP can be executed for one plant only. C. MRP can result in planned orders. D. MRP can result in purchase orders. E. MRP can be executed for a single level or multiple levels of the BOM.

Multiple BOMs can be created for a single material in which of the following situations? (Mã câu: 4029, Số lựa chọn đúng = 3). A. The same material is produced in different plants. B. The material is produced in the same lot sizes. C. The material is produced in different lot sizes. D. A bike model is upgraded with a new tire. E. The company applies a make-to-order production planning strategy to fulfill a customer order for a material.

Lot size dependent times remain the same regardless of the amount of the material being procured. (Mã câu: 4103, Số lựa chọn đúng = 1). A. True. B. False.

The organizational data elements in material planning are: (Mã câu: 4050, Số lựa chọn đúng = 1). A. Plant, production version, company code. B. Planning version, company code, client. C. Client, company code, production version. D. Storage section, client, storage location. E. Client, company code, plant, storage location.

Which of the following are steps in the MRP procedure? (Mã câu: 4040, Số lựa chọn đúng = 3). A. Check planning file. B. Scheduling. C. Lot size calculation. D. Bins calculation. E. Storage location inspection.

Which of the following represent reasons why a company should maintain a safety stock? (Mã câu: 4023, Số lựa chọn đúng = 3). A. The ERP system can be configured to automatically prevent inventory from falling below the safety stock levels. B. To avoid stock-outs. C. Maintaining a safety stock of at least 20 pieces is mandatory in the ERP system. D. Maintaining a safety stock will guarantee that supply meets demand. E. To avoid lost sales.

The proposals that material planning generates typically are in the form of (Mã câu: 4015, Số lựa chọn đúng = 2). A. A planning proposal. B. Planned orders. C. A material order list. D. Purchase requisitions. E. Purchase list.

A purchase requisition is (Mã câu: 4048, Số lựa chọn đúng = 1). A. A confirmation for purchasing materials. B. Proof of delivery. C. A document issued by a vendor. D. A request to purchase materials. E. A confirmation of an inbound delivery.

Identify which of the following are processing keys: (Mã câu: 4042, Số lựa chọn đúng = 2). A. Schedule lines. B. Regenerative planning. C. Net change planning. D. Purchase requisition planning. E. Planning mode.

Which of the following is most likely to trigger the MRP process? (Mã câu: 4078, Số lựa chọn đúng = 1). A. A periodic planning need. B. Changes to MRP elements. C. The need for an operations plan. D. Events affecting demand. E. Events affecting supply.

MPS is a mandatory step in the planning process and is usually followed by MRP. (Mã câu: 4100, Số lựa chọn đúng = 1). A. True. B. False.