option
Cuestiones
ayuda
daypo
buscar.php

Test EWM - Ebook

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
Test EWM - Ebook

Descripción:
Test basado en las preguntas de los libros para certificación

Fecha de Creación: 2021/06/02

Categoría: Informática

Número Preguntas: 96

Valoración:(2)
COMPARTE EL TEST
Nuevo ComentarioNuevo Comentario
Comentarios
NO HAY REGISTROS
Temario:

If you want to run quality inspections in a decentralized SAP EWM, you must have which of the following?. SAP QIE. SAP ERP QM. SAP QIE and SAP ERP QM.

When you experience a difference in counting, which of the following tasks should be performed?. Enter a warehouse process type, to determine the difference bin. Enter an exception code, to determine the follow-up functions. Enter a cost center, to which the difference should be charged.

An inspection lot summary can be done for which of the following? (2). Product/Batch. Product/Batch / Reference Document. Product/Batch / Vendor.

For the preliminary inspection handling unit, which of the following is true?. Firstly, move the HUs to a work center. As the first process for each HU, decide if it is good or bad. You need the integration with SAP ERP QM.

To avoid a goods receipt posting with the receipt control you must do which of the following?. Block the vendor only. Block the product only. Block the vendor and the product.

Acceptance sampling can be used for which of the following?. Externally procured goods. Internally produced goods. Both externally procured and internally produced good.

When acceptance sampling is active, you cannot post goods receipt until a decision is made. True. False.

To create an internal inspection, the products must also be part of an inspection during goods receipt. True. False.

To calculate an inspection date, the system must know the production date. Determine whether this statement is true or false. True. False.

To use automatic recurring inspections, the product must be batch-managed. True. False.

From the following list, identify the value-added service. Warehouse structure. Packaging. Warehouse Management. Cross-Docking.

Which of these functions are available in Warehouse Management? (2). Managing inventory at the storage bin level. Processing sales orders. Purchasing goods. Processing goods movements.

Which SAP system do you use when you create a Purchase Order?. SAP ERP. SAP EWM. SAP Decentralized WM.

Identify the primary function from the following list of warehouse management functions: Slotting. VAS. Inventory management at storage bin level. Labor management.

Product Master Data includes which of the following pieces of information: (3). Product properties. Product stock levels. Product unit of measure. Product classification.

What are packing specifications used for? (2). For palletization. For pick HUs. For unloading.

An Advanced Shipping Notification is based on a Purchase Order. True. False.

Which one of the following objects is required for posting the goods receipt?. Purchase Order. Warehouse Task. Inbound Delivery. Store Location.

A sales order usually comes from: (2). CRM. ERP. SCM.

An SAP EWM outbound delivery sends information about the goods issue posting back to ERP. True. False.

The EWM Warehouse Management Monitor is a customizable, central tool: (2). Providing alert-monitoring capabilities. To keep warehouse managers informed about the current situation in the warehouse. Planning resources for the warehouse.

Layout-oriented storage control is normally used when stock movements in the warehouse do not travel directly from a source storage bin to a destination location. Instead, they travel through an intermediate storage bin or many intermediate storage bins. What is/are the exceptions(s)? (2). When pick points are used. When you want to pack the material at a work center. When you want to switch resources. When you want to apply a value added service.

Do you require a handling unit for the process-oriented storage control?. No, HUs are not required. Yes, HUs are necessary.

A serial number profile is a four-character code that determines the conditions and business transactions for issuing serial numbers to serialized products. Where is the serial number profile created?. Master Data. Customizing.

When posting a goods receipt, you can create a provisional serial number and use this for putaway. True. False.

The Quality Inspection Engine (QIE) provides services to trigger inspection, decisions about quality and quality control levels, and: (3). Creation of samples and calculation of sample size. Printing of work papers. Assigning warehouse staff to quality. Recording of inspection results.

When an inspection document is activated in SAP EWM, the QIE triggers the creation of an inspection lot in ERP QM. In which one of the following systems is the inspection process then executed?. The EWM QM system. The ERP QM system. The external QIE system.

A VAS order is created with reference to: (2). An outbound delivery order. The required packaging specification. A manufacturing request. A picking list.

For a kit-to-order process you need a sales bill of material. True. False.

Which of the following ideal putaway parameters are determined by slotting?. Putaway indicator. Storage section indicator. Bin type. All of the above.

Which of the following factors influence replenishment quantity?. Availability of transportation. Demand forecasts. Supplier availability. Cost.

In planned replenishment, when is replenishment triggered?. When the stock reaches zero. When the stock is less than the minimum quantity. On a predefined date. Only when it is triggered manually.

If you perform the physical inventory using SAP ERP and SAP EWM and if there is a difference with the stock levels, we assume that the stock in SAP EWM is the correct stock quantity. True. False.

What can you do with a wave? (3). Release the wave to create the warehouse task. Add or remove items. Post the goods issue. Delete the wave.

The following list suggests some of the ways in which waves can be processed. Determine which one is incorrect: Locked. Released. Deleted. Split. Shared.

Which of the following data must you enter when processing a document (such as a warehouse order) where the activity is connected with a Labor Management process step? (3). Start time. Finish time. Material. Processor. Warehouse number.

Which two of the following types of labor time are tracked in Labor Management? Choose the correct answers. (2). Direct Labor. Indirect Labor. Unproductive Time. Scheduled Time.

When staging products for a production order with delivery-based production integration, three types of staging are available. What are they? (3). Pick Parts. HU Parts. Release Order Parts. Crate Parts.

You can use the expected goods receipt as a preview of the goods receipt. True. False.

What are the three components to yard management: (3). Yard Movements. Yard Monitoring. Yard Location Management. Yard Stock.

In a yard, which of the following entities can you have? (2). Transportation units. Vehicles. Containers.

Which of the following are ways that you can represent a yard in SAP EWM? (2). A physical location or address. A storage type with the role yard in the warehouse. A storage type with an unspecified role. A separate warehouse number that includes a storage type with the role yard. A storage section.

The SAP EWM integration to transportation planning in ERP is possible in which of the following scenarios: Only for inbound. Only for outbound. For inbound and outbound.

Which of the following might a "yard" storage bin represent? (3). Parking space. Checkpoint. Manufacturing line. Door.

The integration between the ERP system and the EWM system includes a mapping table that maps the ERP Delivery item categories to the EWM item type code. True. False.

To successfully integrate SAP ERP with SAP EWM, in SAP ERP a plant and a storage location are assigned to which of the following?. Storage type. Warehouse number. Distribution model. Logical system.

For a decentralized EWM based on SAP S/4HANA, the following master data is distributed via ALE: (2). Materials. Customers. Packing Instructions. Plants.

A packaging specification consists of a header, a level component, an element group, and which two of the following structural components? (2). Element. Pilferable indicator. Contents. Max no. of bins.

In SAP EWM Customizing, the ERP plant, storage location, and logical system maps to an availability group. True. False.

In storage section determination, what parameters are used to determine the storage section? (3). Storage type. Bin type. Storage section indicator from the warehouse product master. Hazardous attributes.

Which of the following putaway strategies are used when the system puts away stock based on the handling unit type? (2). General storage. Additions to existing stock. Pallet storage. Bulk storage.

What process can you employ instead of capacity checking?. Storage bin type determination. Process type determination. Storage process determination.

Based on parameters from the outbound delivery order (ODO), the warehouse product master, and the hazardous material master data, what does the system determine? (2). The storage type search sequence. The stock removal rule. Stock removal control indicator. Warehouse process type.

Which of the following attributes are available for wave template options? (3). Date and time data. Calender. Release method. Mode.

When you combine the process-oriented control with the layout-oriented storage control, which of the following is true?. SAP EWM always determines the process-oriented storage control first. SAP EWM always determines the layout-oriented storage control first. It does not matter which type of storage control is determined first.

You can use physical inventory functions in EWM to carry out a physical inventory of products and handling units (HUs) for stock control and balance sheet purposes. Which of the following are physical inventory functions in EWM? (2). Storage bin-specific physical inventory. HU-specific physical inventory. Storage type-specific physical inventory. Product-specific physical inventory.

Which of the following statements about actions is true? (3). You configure actions only at the header level of the document. You can configure actions both at the header level or at the item level of the document. You define actions under an Action Profile. Actions can be performed in the background by the system, by a person, or by a group/organizational unit.

Under what circumstances can you use direct outbound delivery orders? (4). Pickup. Kit to order. Kit-to-stock or reverse kitting. Scrapping. Immediate deliveries.

What data is entered to perform the availability check? (4). Ship-to party. Item. Quantity. User ID. Stock type.

Cartonization planning can happen for which of the following processes or document? (3). Outbound delivery orders. During picking. During putaway. During packing.

The collaboration with appointment planners for carriers is based on which of the following: (3). A user with complete authorization. A business partner that represents an appointment planner for a carrier. An assignment of the appointment planner for a carrier to a specific carrier. A user with restricted authorization.

Which of the following structures are possible in a yard? (3). Parking spaces. Doors. Transportation units. Checkpoints.

With the Shipping Cockpit, SAP offers a user-centric UI for the shipping office clerk to do the following: (3). Plan shipping activities. Execute tasks. Monitor outbound operations in the warehouse. Execute a delivery order.

What values can the system determine using determination rules? (4). Staging bays. Staging area. Warehouse process type. Doors. Staging area groups.

What processes are supported when SAP TM is integrated with SAP EWM? (3). Outbound process with order-based transportation planning in SAP TM. Outbound process with transportation planning in SAP ERP. Outbound process with delivery-based transportation planning in SAP TM. Outbound process with transportation planning in SAP EWM Correct.

The SAP RF framework offers which of the following RF functionalities? (4). Work execution transactions for warehouse processes. Split screen. Logon. Log off. Recovery.

What do you have to define to adapt verification fields in RF screens? (2). A verification profile. The verification profile determination. A combined picking profile.

What possibilities has the user for the selection of the warehouse order when working with the Pick by Cart app? (2). The user manually selects the warehouse order. The user chooses a queue and processes the warehouse order which is assigned to him. The user processes the warehouse order which is assigned to him by a queue.

When working with semi-system-guided queues, after scanning the system checks which of the following? (3). The scanned HU is available in the specified storage bin. The HU field is empty. An open warehouse task exists for this HU. The reported resource is allowed to process the HU.

What are the requirements for pick, pack, and pass? (3). A Warehouse Order creation rule. Queue types. Define which bins represent the start point and end point for each picking zone. Each picking zone must be mapped as an individual activity area Correct.

For layout-oriented storage control, you need: A work center for packing. A material flow system (MFS). Handling units.

In the MFS, the warehouse can be mapped using which of the following components? (3). Conveyor segment. Conveyor line. Communication channel. Communication point.

A serial number is a character string that is given to a product to differentiate the individual piece from all the other pieces. True. False.

A kit is a bill of material that is always delivered completely and assembled. True. False.

How are batches distributed from the ERP system to SAP EWM? (2). CIF. IDoc. Process Integration (PI). ICM.

Which of the following statements are true of Labor Management activation?. Internal process steps and external process steps are activated separately. When internal process steps are activated, their related external process steps are activated automatically. Process-oriented storage control is a requirement for Labor Management. External process steps that are not needed for Labor Management must remain activated.

Which of the following is mandatory in the processors master record?. Warehouse number. Processor type. Reporting group. Service start date.

What can you do with shift management? (3). You can determine the labor performance of a shift. You can assign waves to a shift. You can determine the productive labor capacity at a certain point of time. You can assign breaks.

What is the “normal time”?. The normal time is the expected time required to perform some work activity, for example picking or packing, at a normal pace, under normal operating conditions, and using a prescribed method. The normal time is the normal time required to perform a work activity adjusted for allowances. These include time for labor fatigue and personal needs, equipment breakdown, rest periods and information delays. The normal time is the time required to reach the start point of the resource’s work. The normal time is the regular shift start in the warehouse. That’s correct.

Which speed is used for the travel time calculation during warehouse order creation?. The speed of the fastest resource. The average speed of all resources. The speed of the slowest resource.

How are labor activities determined? (2). Directly, if there is a 1:1 relationship a labor activity and an external process step. Using a decision service in BRFplus if there is no 1:1 relationship between a labor activity and an external process step. Indirectly with a PPF action which uses the information of the activity area in the warehouse order. Using condition records which are modelled similar to packaging specifications. That’s correct.

For PFDs, the BRFplus function context contains information about: (3). Processor attributes. Resources. Shifts. Exception codes.

The planned workload document contains information about: (2). The processor. The activity area. The planned end date. The resource.

What is the advantage when using desktop transaction for warehouse confirmation with active labor management?. Entering the information is fast and secure. Only the processor and end time has to be entered, so the processing time is always 0. Processors are not required. The processor and the start and end time are automatically determined. That’s correct.

How are executed workload documents created? (3). Automatically when a Labor Management-relevant document is completed. Manually in the warehouse management monitor. Manually in the Create Indirect Labor Activities Based on Attendance application. Manually in the VAS work center.

Which of the following is a function of the performance document?. It allows you to compare planned and actual times objectively. It enables you to calculate the number of employees required for a workload. It provides an overview of the technical performance of the EWM system. It allows you to perform employee-related evaluations of tasks.

What is required for the Executed Workload Analysis?. ELS with work step sequences. ELS with BRFplus. No labor management. Preprocessing.

Advanced production integration supports which of the following processes? (2). Production Orders. Process Orders. Kanban. Repetitive Manufacturing.

Advanced production integration is typically used in which of the following scenarios? (2). Mechanical Engineering. Consumer products. Process industry.

A production supply area is required in SAP ERP and in SAP EWM. What possibilities do you have to create the PSA? (2). A PSA is manually created in SAP ERP and then replicated into SAP EWM with automatic mapping. A PSA is manually created in SAP ERP, manually created in SAP EWM and a manual mapping is required. A PSA is manually created in SAP EWM and then replicated to SAP ERP.

Control cycles are required to control which of the following processes?. How a material is staged. What costs are to be calculated. Which warehouse process type is used for picking.

For the delivery based production integration with one warehouse the delivery document in SAP ERP is always which of the following?. An outbound delivery. An inbound delivery. A posting change.

For the consumption posting with the delivery based production integration you start the posting process in which of the following?. SAP ERP. SAP EWM.

When staging is triggered from SAP ERP with the advanced production integration, which of the following occurs?. An outbound delivery is created in ERP and copied to SAP EWM as a posting change. An outbound delivery and an inbound delivery are created in SAP ERP. A production material request is created in SAP EWM.

For the goods receipt posting triggered from SAP ERP the system, which of the following is created in the ERP system?. An inbound delivery. An outbound delivery. A posting change.

The expected goods receipt can run in which of the following? (2). SAP ERP. SAP EWM. SAP CRM.

Denunciar Test